İMKB Değerleri
  • USD2.34 USD
  • EURO2.79 EURO
  • Altın88.81 Altın
  • Benzin4.19 Benzin
  • İMKB 30122,129.41 İMKB 30
  • IMKB 10099,547.68 IMKB 100

SON Dakika

  • Eklenme Tarihi :
  • 25 Ocak 2014, Cumartesi 11:52

Switching from Coal to Fire Truck Suspension Bridge when it works

follow
Switching from Coal to Fire Truck Suspension Bridge when it works
0/10 (0 person)
Facebook Twitter

Yusufeli district of Artvin Coruh River trying to cross a suspension bridge over the 3.5-ton truck loaded with coal was saved at the last moment to fly to the river.

Artvin news:  Yusufeli district of Artvin Coruh River trying to cross a suspension bridge over the 3.5-ton truck loaded with coal was saved at the last moment to fly to the river.
Meşecik in the neighborhood of the town, which is on the Coruh River trying to cross the drawbridge 3.5 ton truck loaded with coal-plated 61 K 4490 trucks on the bridge can not handle the load began to shift to the right in a moment. The bridges of steel cables hold the bridge into the river was saved at the end of the wing. Coruh River saved from the truck driver Mehmet Akdag, but they always use the bridge said they had the first time such a thing. A moment ago, you want to be a nice bridge to the region Akdag, always in peril said they were tired of crossing the bridge. Neighborhood residents could not be so lucky again stating they wanted to make concrete bridge to the neighborhood.

Switching from Coal to Fire Truck Suspension Bridge when it works" comments for.

RELATED NEWS

TOP NEWS
COMMENTS
copyright 2013 Habermonitor.com